Ƶappַ˿Ƶapp

Volvo generator rental lease
Time: 2016-11-5 15:54:47 Author: Ben Waugh Nanjing View: Times

Generator operation:
1. After the unit starts, check the parameters of the control box module; oil pressure, water temperature, voltage, frequency, etc .;
2. Under normal circumstances, the speed of the unit directly reaches the rated speed after the unit is started; for units with idle speed requirements, the idle time is generally 3 ~ 5min, and the idle time is not easy to be too long, otherwise the generator related components may be burned;
3. Check the oil, water and electrical leakage of the unit;
4. Check the tightness of each connection of the unit to see if there is looseness and severe vibration;
5. Observe whether the various protection and monitoring devices of the unit are normal;
6. When the transfer rate reaches the rated speed, and the parameters for starting and no-load operation are stable, the power supply is turned on;
7. Check whether the parameters of the control screen are within the allowed range, and check the vibration of the unit again for three leaks and other failures;
8. Overload is strictly prohibited when the unit is running.


Link to this article: http://dcdushi.com/news/58.html
下一篇: 沃尔沃发电机租赁 Previous: Volvo generator rentalNext: Volvo generator rental
Beowow "Internet"